Skip to content

County 5

Local news from local people for Albany County, Wyoming

Menu
  • Home
  • Contact Us
Menu

Construction On Pierce Street Begins Mon. Sept. 21

Posted on September 18, 2026 by Paul

Construction on the Pierce Street Pressure Reducing Valve (PRV) Project will begin Monday, September 21, 2026. Work will take place along Pierce Street between Centennial Drive and Westview Drive.

The project includes replacing the existing aging, underground PRV vault with a new aboveground PRV building located within City right-of-way. The improvements will provide safer and more accessible facilities for City operations and maintenance.

A lane shift will be in place through the work zone while construction is underway. Motorists are encouraged to allow extra travel time, follow posted traffic control, and use caution when traveling through the area. Please watch for construction crews and equipment entering and exiting the work zone.

The City of Laramie appreciates the public’s patience and cooperation as these important water system improvements are completed.

For comments or questions contact Engineering: 307-721-5250 or engineering@cityoflaramie.org

Leave a Reply Cancel reply

You must be logged in to post a comment.

loader-image
Local Weather
Laramie, WY
8:51 pm, November 18, 2026
34°F
clear sky
29 %
1020 mb
14 mph
Wind Gust: 0 mph
Clouds: 0%
Visibility: 10 km
Sunrise: 6:54 am
Sunset: 4:41 pm

©2026 County 5 | Design: Newspaperly WordPress Theme