Skip to content

County 5

Local news from local people for Albany County, Wyoming

Menu
  • Home
  • Contact Us
Menu

3rd Street Utility Rehabilitation Phase 2 Scheduled For This Summer

Posted on March 16, 2022March 16, 2022 by Press Release

The City of Laramie is continuing a multi-phase water system rehabilitation project in the 3rd Street corridor.

This second phase will be constructed during the summer of 2022 and will occur inside the 3rd Street public right of way. The project generally involves abandoning the old water main and installing a new one along the western side of the street. The project will include the replacement of the water main within 3rd Street between Sheridan Street and Gibbon Street. Additionally, water main repairs will be made in both the 3rd Street and Baker Street intersection and the 3rd Street and Fetterman Street Intersection. There will be unavoidable temporary inconvenience to area businesses and the public.

Property owners who obtain water service from 3rd Street will receive water from a safe and tested temporary service connection. There may be differences in the volume and pressure with this temporary service. It is the responsibility of the property owners to notify tenants in the project area of the upcoming construction.

The City of Laramie is available for questions and comments by email at engineering@cityoflaramie.org or by phone at 307-721-5250.

  • City of Laramie
  • Construction Projects
  • Leave a Reply Cancel reply

    You must be logged in to post a comment.

    loader-image
    Local Weather
    Laramie, WY
    11:05 pm, November 18, 2026
    31°F
    clear sky
    31 %
    1019 mb
    7 mph
    Wind Gust: 0 mph
    Clouds: 0%
    Visibility: 10 km
    Sunrise: 6:54 am
    Sunset: 4:41 pm

    ©2026 County 5 | Design: Newspaperly WordPress Theme